Application examples

Using CONDAMOS in the production

Together with suitable sensors and process monitoring via CONDAMOS, the early detection and the causal determination of process errors can be simplified and the repair effort and costs can be significantly reduced.

Following we listed some possible application examples for error detection and process optimization.

Hot runner protection

for sustainable cost savings

Problem:

Complex injection moulding tools with hot runner system are often affected by overmoulding, wear and failure..

Solution approach:

  • Leakage detection in real time by evaluating the performance data of the temperature sensors and heaters
  • Placement of suitable sensors in the hot runner manifold
  • Monitoring of the hydraulic / pneumatic cylinders

Early notification and detection of impending system failure

Cycle times

too long and based on experience

Problem:

Cycle times change in the injection molding process.
The material characterization happens in the laboratory , independently of the actual process. 

Solution approach:

  • Evaluation of the demoulding forces to detect a change in the proportion of recycled material in the injection molding process

Application examples

Using CONDAMOS in the production

Together with suitable sensors and process monitoring via CONDAMOS, the early detection and the causal determination of process errors can be simplified and the repair effort and costs can be significantly reduced.

Following we listed some possible application examples for error detection and process optimization.

Hot runner protection

for sustainable cost savings

Problem:

Complex injection moulding tools with hot runner system are often affected by overmoulding, wear and failure..

Solution approach:

  • Leakage detection in real time by evaluating the performance data of the temperature sensors and heaters
  • Placement of suitable sensors in the hot runner manifold
  • Monitoring of the hydraulic / pneumatic cylinders

Early notification and detection of impending system failure

Cycle times

too long and based on experience

Problem:

Cycle times change in the injection molding process.
The material characterization happens in the laboratory , independently of the actual process. 

Solution approach:

  • Evaluation of the demoulding forces to detect a change in the proportion of recycled material in the injection molding process